- Interested offerors should pay special attention to the scheduled pre-proposal conference portion in each of the requests.
- Submitted proposals shall not be publicly opened.
- Proposals must be submitted in a sealed envelope with the proposal number and deadline date clearly indicated on the bottom left hand side of the front of the envelope.
- The contents of any proposal shall not be disclosed during any negotiations that may occur.
- All proposals shall be valid until contract is awarded.
- Proposals will be made public after award has been announced.
- Amendments, Addenda and Revised RFPs will be presented on this website.
Respond Now
|
Commodity Group
Construction Services Heavy (Incl. Maintenance And Repair Services),Equipment Maintenance And Repair Services For Agricultural Construction Heavy Industrial Material Handling And Road And Highway Equipment,Road And Highway Building Materials (Asphaltic)
|
Commodity Description
Asphalt AC (Asphalt/Cement),Asphalt AC (With Latex/Polymer),Asphalt Aggregates,Asphalt Emulsified,Asphalt Emulsified (With Latex/Polymer),Asphalt Oil,Asphalt Pervious Hot Mix,Asphalt Uintaite,Asphaltic Concrete Cold Laid,Asphaltic Concrete Hot Laid Including Bituminous Materials,Asphaltic Shell,Concrete and Asphalt Equipment (Not Otherwise Classified) Maintenance and Repair,Maintenance and Repair Highway and Road (To include the removal of asphalt concrete bitumens etc),Patching Mix Asphalt Concrete,Rock Asphalt,Stabilized Base Asphaltic
|